When is a building permit required?

Building permits are required for most construction activity. VUSBC Section 108 requires a permit to be issued by the building code official when:

  • Above and in-ground swimming pools.
  • Changing the use of a building either within the same use group or to a different use group when the new use requires greater degrees of structural strength, fire protection, exit facilities or sanitary provisions. Constructing, enlarging, altering, repairing, or demolishing a building or structure. Fences associated with swimming pools.
  • Installing or altering any equipment which is regulated by this code.
  • Removing any asbestos containing material. When erecting a tent greater than 900 square feet in size and intended to be used by fifty or more persons.
  • When installing or extending any plumbing, electrical, or mechanical systems.
  • When moving a lot line that increases the hazard to or decreases the level of safety of an existing structure in comparison to the building code under which the structure was built.

Show All Answers

1. What are the hours of operation for the Building Safety Office?
2. What is a building permit?
3. When is a building permit required?
4. Who reviews building plans?
5. Do I need a permit for ordinary repairs?
6. What are some of the significant changes in the 2018 code cycle?
Homepage